Skip to content

Free General Contractor Practice Exam (25 Questions)

This free general contractor practice exam has 25 questions on the subjects contractor licensing exams test most: jobsite safety and OSHA, building codes and inspections, project management, business and contract law, trade fundamentals and estimating.

Many states split contractor licensing into a trade exam and a business and law exam. Use this test to check where you stand, then study the references listed in your state's candidate bulletin.

  • Questions

    25

  • Time

    ~25 min

  • Aim for

    80%+

  • Sign-up

    Not needed

0 of 25 answeredChoose an answer to begin
  1. 1Codes & Inspections

    Under the IPC, a plumbing vent pipe must have a minimum diameter that is generally not smaller than:

  2. 2Safety & OSHA

    A foreman is reviewing required protections at an open 5-foot-deep excavation. All of the following are required by OSHA EXCEPT:

  3. 3Project Management

    After the bid opening, a general contractor approaches a low subcontractor and asks for an even lower price, then uses the new number to negotiate further. This practice is:

  4. 4Trade Fundamentals

    A plumber installs a hot water expansion tank. The principal reason for the tank in a closed system is to:

  5. 5Trade Fundamentals

    An engineer specifies an LVL beam for a load-bearing remodel. LVL stands for:

  6. 6Safety & OSHA

    A maintenance worker is preparing to clean a jammed conveyor that is normally driven by an electric motor. Under OSHA's lockout/tagout standard, what is the worker's required first step?

  7. 7Safety & OSHA

    An employer's bloodborne-pathogens exposure control plan must be:

  8. 8Codes & Inspections

    A homeowner asks her plumber why every kitchen and bathroom sink has a curved trap pipe under it. The plumber correctly explains that the P-trap:

  9. 9Safety & OSHA

    A worker selects hearing protection. The Noise Reduction Rating (NRR) on the package indicates:

  10. 10Project Management

    An owner sets aside a percentage of the project budget to address unknown unknowns and risk events. This reserve is called:

  11. 11Business & Law

    A worker in California, when classified for wage law purposes, is subject to the 'ABC test.' Under this test, a worker is presumed to be:

  12. 12Safety & OSHA

    A general contractor is choosing between a Class A and Class C portable fire extinguisher for an active electrical room. The correct choice is:

  13. 13Safety & OSHA

    A trenching crew arrives at a 7-foot excavation that was left open overnight after heavy rain. Who is responsible under OSHA for inspecting the trench before workers re-enter?

  14. 14Project Management

    A project manager wants to know whether the project is ahead of or behind schedule based on work completed. He calculates Schedule Variance as:

  15. 15Safety & OSHA

    Under OSHA's HazCom Standard with GHS labeling, a chemical container must include all of the following EXCEPT:

  16. 16Business & Law

    A subcontract contains a clause stating that the sub assumes toward the GC the same obligations the GC has toward the owner. This is a:

  17. 17Safety & OSHA

    A jobsite stairway has six risers leading to a deck. Under OSHA, the stairway must be equipped with handrails because it has more than:

  18. 18Safety & OSHA

    A scaffold being erected will have a working platform 18 feet above the next lower level. Under OSHA, the platform must be guarded with:

  19. 19Estimating & Materials

    An estimator must add bond premiums to a $1,000,000 project bid. Typical performance and payment bond premium is approximately:

  20. 20Estimating & Materials

    An estimator computes the area of a triangular roof section: 30 ft base × 12 ft height. The square footage is:

  21. 21Trade Fundamentals

    An electrician installs an outdoor receptacle for landscape lighting. Under the NEC, the receptacle must be:

  22. 22Safety & OSHA

    A crew is working over open water 8 feet below the deck of a bridge. Under OSHA, before work begins the employer must provide:

  23. 23Business & Law

    During a sales pitch, a roofer assures a homeowner in writing that his shingles will last 30 years. This statement creates a(n):

  24. 24Codes & Inspections

    Under the IECC, blower-door testing of new low-rise residential construction must demonstrate air leakage no greater than:

  25. 25Estimating & Materials

    An estimator quantifies rebar. The unit weight of #5 rebar (5/8-in diameter) is approximately:

Want more than 25 questions?

Finish this test, then keep going inside the app.

Frequently asked questions

Are these real PSI contractor exam questions?
No. Real exam questions are confidential. These are original practice questions written to match the content areas, wording style and difficulty of PSI contractor licensing exams.
Is this practice test free?
Yes. You can take all 25 questions here without an account, and see the correct answer and explanation for each one.
How do I get more practice questions?
Create a free PSI Exams Prep account to practice from a bank of 400 contractor questions with timed exam mode, topic mastery tracking, mistakes review and a daily challenge.

More free practice tests

PSI Exams Prep is an independent study tool and is not affiliated with or endorsed by PSI Services LLC. These are original practice questions, not actual exam questions.